Skip to content
E3TAM

Coffee machine maintenance tests: central analysis of service stations

Application example

Test modules on the service benches measure pump pressure and brew temperature of each machine and send them to a central board. Station data is gathered on one screen and the trend across test runs is compared with the limit.

central data collectiontrend analysispressure and temperature test
Information delivered

Station measurements are stored in the central database; a station below the limit is flagged on the board and the stack light, and the machine concerned is linked to a service work order.

Coffee machine maintenance tests: central analysis of service stationsILLUSTRATIVE SIMULATION
Coffee machine maintenance tests: central analysis of service stations
  1. 01 Test
  2. 02 Data transfer
  3. 03 Central analysis
  4. 04 Decide
—

On each bench the machine runs a brew cycle while the module measures.

Active stations
—
Readings logged
—
Lowest pressure
—

Scenes are illustrative simulations; they are not customer references or performance guarantees.

Need

Service benches are in different places and with different technicians; the pump pressure drop of a single machine develops slowly and can look within limits in a single test. The problem only becomes visible when station data is watched on the same screen across repeated tests.

Solution approach

The test module on each bench measures pump pressure and brew temperature during the brew cycle and sends them to the central board with the station code. The board plots the latest values of every station and the pressure trend of recent tests; when a value or the trend drops below the limit the station is flagged and the stack light warns.

Process steps

  1. 01

    Test

    On each bench the machine runs a brew cycle while the module measures.

  2. 02

    Data transfer

    Measurements are sent to the central board with their station code.

  3. 03

    Central analysis

    The pressure trend of each station is plotted over recent tests.

  4. 04

    Decide

    Latest values and trend are compared with the limit.

Vision system design

Let us assess your application together

We test your sample in our laboratory and report on resolution, optics and lighting selection.

+90 212 275 2280 – 81
Esentepe / İstanbul · İkitelli OSB Laboratory
Request Feasibility