Skip to content
E3TAM

Panel identity and inspection-evidence handoff between stations

Solution concept

Panel tracks from both stations link to the same item record. A verified match extends the record; a changed identity never inherits the previous conformity verdict. Vision, identity and command states are animated as an illustrative simulation.

Artificial intelligenceitem trackidentity associationverdict associationhold uncertain targets
Information delivered

Panel tracks from both stations link to the same item record. A verified match extends the record; a changed identity never inherits the previous conformity verdict.

Panel identity and inspection-evidence handoff between stationsILLUSTRATIVE SIMULATION
Panel identity and inspection-evidence handoff between stations
  1. 01 Frame
  2. 02 Track
  3. 03 Associate
  4. 04 Validate target
  5. 05 Allowed command and record
—

Items arrive and the initial frame and item context are established. Vision results are illustrative.

Visible item tracks
—
Valid associations
—
Simulated command
—

Scenes are illustrative simulations; they are not customer references or performance guarantees.

Need

A white-goods panel can be reordered or re-fed before the next station, associating its first inspection record with another item. Its identity must survive station handoff.

Solution approach

The first-station panel image is matched to the second-station identity; changing items never transfers an old inspection verdict to a new panel.

Process steps

  1. 01

    Frame

    Items arrive and the initial frame and item context are established. Vision results are illustrative.

  2. 02

    Track

    Each visible item receives a separate track contour; the first contour is the annotated track component.

  3. 03

    Associate

    The first-station panel image is matched to the second-station identity; changing items never transfers an old inspection verdict to a new panel.

  4. 04

    Validate target

    The track is checked against its event record and uncertain association enters HOLD. No physical command has been applied in this phase.

  5. 05

    Allowed command and record

    Only a validated item receives a routing command; the other cycle has no command and keeps the association under review.

Vision system design

Let us assess your application together

We test your sample in our laboratory and report on resolution, optics and lighting selection.

+90 212 275 2280 – 81
Esentepe / İstanbul · İkitelli OSB Laboratory
Request Feasibility