Skip to content
E3TAM

Industrial maintenance evidence agent

Solution concept

Maintenance findings retain image and signal references. Approved work enters a controlled task list; missing sensor evidence requests further data collection instead of an intervention. The workflow, tool calls and human approval are simulated.

Artificial intelligenceread-only evidencetool orchestrationhuman approvalaudit trail
Information delivered

Maintenance findings retain image and signal references. Approved work enters a controlled task list; missing sensor evidence requests further data collection instead of an intervention.

Industrial maintenance evidence agentILLUSTRATIVE SIMULATION
Industrial maintenance evidence agent
  1. 01 Read evidence
  2. 02 Tool calls
  3. 03 Evidence-linked plan
  4. 04 Human review
  5. 05 Approval and command gate
—

The item image and event context are read while the item arrives. No live external-system connection is used.

Evidence records
—
Simulated approval
—
Simulated tool calls
—

Scenes are illustrative simulations; they are not customer references or performance guarantees.

Need

When wear images and vibration events are stored separately, maintenance staff struggle to connect product defects with machine condition. Automatic intervention from a single signal is inappropriate.

Solution approach

The agent joins maintenance history, vibration summaries and surface images by a time window. Consistent evidence supports an inspection task; missing sensor records remain visible. An authorised person reviews the draft work order.

Process steps

  1. 01

    Read evidence

    The item image and event context are read while the item arrives. No live external-system connection is used.

  2. 02

    Tool calls

    The scenario read-only tools compare simulated evidence packages: HISTORY + SIGNAL.

  3. 03

    Evidence-linked plan

    Sources are associated in the WEAR / TREND context and a WORK ORDER plan is drafted. Missing evidence remains separate.

  4. 04

    Human review

    The plan enters simulated review; this phase is not approval. Missing or conflicting evidence produces a visible HOLD state.

  5. 05

    Approval and command gate

    Only the virtually approved cycle opens the allowed-command gate and releases the item. A held cycle keeps the gate closed without issuing a command.

Vision system design

Let us assess your application together

We test your sample in our laboratory and report on resolution, optics and lighting selection.

+90 212 275 2280 – 81
Esentepe / İstanbul · İkitelli OSB Laboratory
Request Feasibility