Skip to content
E3TAM

Vision-verified part loading into a CNC machine

Solution concept

The simulated loading record links the correct shaft, seating and machine sequence. Missing door, fixture or grip conditions prevent completion and hold process permission. Calibration, grip and PLC sequence are animated as an illustrative simulation.

vision-located targetgrip confirmationphysical transferfinal placement check
Information delivered

The simulated loading record links the correct shaft, seating and machine sequence. Missing door, fixture or grip conditions prevent completion and hold process permission.

Vision-verified part loading into a CNC machineILLUSTRATIVE SIMULATION
Vision-verified part loading into a CNC machine
  1. 01 Image and source
  2. 02 Pose and plan
  3. 03 Grip and lift
  4. 04 Transfer
  5. 05 Release and final check
—

Image the blank shaft and establish contour and loading orientation.

Illustrative pose offset
—
Illustrative grip confirmation
—
Completed transfers
—

Scenes are illustrative simulations; they are not customer references or performance guarantees.

Need

Blank-shaft orientation, fixture clearance and machine-ready sequence require joint verification. Detecting the correct part does not authorize loading when door or fixture conditions are unsuitable.

Solution approach

Locate shaft contour and orientation; follow machine-ready, door and target-fixture information separately in the simulated PLC sequence. Grip, lift and carry the shaft to the loading area. Confirm seating and robot withdrawal after release before representing process permission.

Process steps

  1. 01

    Image and source

    Image the blank shaft and establish contour and loading orientation.

  2. 02

    Pose and plan

    Check the target fixture and machine-ready sequence; prepare the simulated approach.

  3. 03

    Grip and lift

    Grip the shaft with parallel fingers and lift from its presentation fixture.

  4. 04

    Transfer

    Carry the shaft into the loading area; show machine conditions as separate process signals.

  5. 05

    Release and final check

    Lower and release the shaft; seating and withdrawal confirmation complete the loading record.

Vision system design

Let us assess your application together

We test your sample in our laboratory and report on resolution, optics and lighting selection.

+90 212 275 2280 – 81
Esentepe / İstanbul · İkitelli OSB Laboratory
Request Feasibility